House for sale/rent, Taman Kopo Asri Housing Complex Land area 78, building area 110, 2 floors 6 meters wide, west-facing. First floor - 1 bedroom,...
Properties in Taman Kopo Asri
Showing 1–20 of 314 Properties
Margahayu, Bandung
2-Storey Semi-Furnished House Ready to Occupy, Taman Kopo Asri Bandung Land Area 78, Building Area 80, 2 floors 6 meters wide, facing west. 1st fl...
Katapang, Bandung
Limited opportunity for you to acquire a strategic home with high investment returns in Katapang, Bandung. This home offers complete facilities an...
At KOPO KATAPANG PARK (Bandung Regency) ✅ East-facing ✅ 1 Floor ✅ Land Area 84 m² ✅ Building Area 70 m² ✅ Width 6 m Highly Strategic A...
Margahayu, Bandung
22KA - 0813-2009-4100 For Sale Strategic Home in Taman Kopo Asri Property Type: House Sale/Rent: For Sale Land Size/Building Size: 80m² / 80m² F...
#16155 For sale house in a quiet area. This single-story property is located in a strategic neighborhood. The categories are as follows: - Bed...
House for Sale/Rent Taman Kopo Asri Housing Estate, Bandung Land area 78, Building area 110, 2 floors 6 rooms, west-facing 1st floor - 1 bedroom, 1...
Sukaraja, Bogor
Translate to English:
Sukaraja, Bogor
Translate to English:
Sukaraja, Bogor
Translate to en:
Sukaraja, Bogor
Certainly! Please provide the text you'd like me to translate to English.
Land Area 84 m2 Building Area 124 m2 Front Width 6.2 Meters Bedrooms 3 Bathrooms 2 Legality SHM (Certificate of Ownership) 2-Storey Building Electr...
Bogor Selatan, Bogor
Foundation: Footing Foundation Walls: Red Brick Facade: Granite Tile (Matt), Ornament, and Grillwood Paint Finish: Former Jotun Paint Floor Finishi...
Bogor Selatan, Bogor
Foundation: Footing Foundation, Walls: Red Brick, Facade: Granite Tile (Matt), Ornament and Grillwood, Paint Finishing: Former Jotun Paint...
Bogor Selatan, Bogor
Foundation: Footing Foundation, Walls: Red Brick, Facade: Granite Tile (Matt), Ornament and Grillwood, Paint Finish: Formerly Jotun Paint,...
Karawang Timur, Karawang
Foundation: Footing Foundation Structure: K250 Ready-mix Concrete, SNI Standard Steel Walls: Lightweight Brick Walls Floor: 60x60 Homogeneous Tile ...
Karawang Timur, Karawang
Strip Footing Foundation K250 Ready-Mix Concrete Standard SNI Steel Inter-unit lightweight brick walls Inter-room lightweight brick walls Bathroom ...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Structure: Reinforced Concrete Walls: Lightweight Brick with Mortar Finish Paint Partition Walls: Double Walls Back...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Structure: Reinforced Concrete Walls: Lightweight Brick + Mortar Finish Paint Partition Walls: Double Wall Back Fen...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Structure: Reinforced Concrete Walls: Lightweight Brick + Mortar Finish Paint Partition Walls: Double Wall Back Fen...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Structure: Reinforced Concrete Walls: Lightweight Brick + Mortar Finish Paint Partition Walls: Double Wall Back Fen...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Footing Foundation, Structure: Reinforced Concrete, Walls: Brick + Mortar Paint Finish, Partition Walls: Do...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Footing, Structure: Reinforced Concrete, Walls: Brick + Mortar Finish Paint, Boundary Walls: Double Wall, ...
Cikupa Citra Raya, Tangerang
Foundation: Reinforced Concrete Footing, Structure: Reinforced Concrete, Walls: Brick + Mortar Paint Finish, Partition Walls: Double Wall,...
Property in Taman Kopo Asri
Average Price
Rp 1,1 MiliarHighest
Rp 2,7 MiliarLowest
Rp 624,5 Juta*Data as of 01 March 2026 from 82 properties listed on Rumah123
Mortgage Bank Options

Interest From
Interest 6.3%Installments From
Rp -Loan Term
5-20 Years
Interest From
Interest 6.99%Installments From
Rp -Loan Term
3-20 Years
Interest From
Interest 6.88%Installments From
Rp -Loan Term
4-20 Years
Interest From
Interest 5.75%Installments From
Rp -Loan Term
8-20 Years
Interest From
Interest 4.56%Installments From
Rp -Loan Term
2-25 Years
Interest From
Interest 3.48%Installments From
Rp -Loan Term
12-20 YearsReviews for Taman Kopo Asri
5
4
3
2
1
Saat ini belum ada ulasan untuk Taman Kopo Asri
Eligibility: Available for landed houses and apartments under Hak Pakai (Right to Use).
Requirements: Must hold a valid KITAS/KITAP, no company needed.
Ownership Term: Initial 30 years, extendable up to 80 years total.
Process: Must be processed by a licensed notary and registered with the National Land Agency (BPN).
Property Criteria: Must meet government-set price and location rules.





















































































































